The webpage is not working since JavaScript is not enabled. Most likely, you are viewing using Dropbox website or another limited browser environment.
Update
Reset
Building information:
Yes
No
""
Yes
No
""
A-1
A-2
A-3
A-4
A-5
B
E
F-1
F-2
H-1
H-2
H-3
H-4
H-5
I-1 Cond 1
I-1 Cond 2
I-2
I-3
I-4
M
R-1
R-2
R-3
R-4
S-1
S-2
U
""
I-A
I-B
II-A
II-B
III-A
III-B
IV-A
IV-B
IV-C
IV-HT
V-A
V-B
""
No sprinklers
Fully sprinklered per NFPA 13
Fully sprinklered per NFPA 13R
Fully sprinklered per NFPA 13D
""
""
""
""
""
""
""
Warnings and fun facts:
""
2021 IBC
2024 IBC
Imperial
S.I.
""
Frontage increase factor:
Based on IBC Tables
Based on IBC Tables with interpolation
Based on larger of the IBC options
Based on 2018 IBC Equations 5.4 and 5.5
Allowable Areas and Heights:
2. Proposed number of stories must be a positive integer.
Last revision: 20 March 2024
Update
Reset